  1. Classical and stochastic mine planning techniques, state of the art and trends

    Vidal Félix Navarro Torres, Beck Nader, Carlos Enrique Arroyo Ortiz e mais 7REM - International Engineering Journal2018

    Abstract Determination of the best possible ultimate pit for an open pit mine is a fundamental subject that has undergone a highly evolutionary process, reviewed in this study, since the correct choice carries substantial economic impact for the industry. The correct choice can be very beneficial for project analysis…

  2. Comparison between the application of the conventional mine planning and of the direct block scheduling on an open pit mine Project

    Pedro Henrique Alves Campos, Ivo Eyer Cabral, Carlos Enrique Arroyo Ortiz e mais 1REM - International Engineering Journal2018citado por 2 artigos

    Abstract Historically, since the 60's, traditional mine planning consists of several distinct stages: 1) Definition of the ultimate pit - the portion of the blocks that results in the greatest total value; 2) Pushback selection - based on the generation of nested pits, obtained with the change in the value of the ore…

  3. Performance indicators and their importance for effective short-term and operational mine planning

    Vilson Carlesso dos Reis e Beck NaderREM - International Engineering Journal2023

    Abstract Mining in Brazil is one of the pillars that support its GDP (gross domestic product). Its execution requires technique and expertise. In a mining venture, the value chain drives the business to achieve its goals. Mine planning has a great influence on its performance, as it is through it that the organization…

  4. A Constraint Programming approach to solve the clustering problem in open-pit mine planning

    Jorge Luiz Valença Mariz, Rodrigo de Lemos Peroni e Ricardo Martins de Abreu SilvaREM - International Engineering Journal2024

    Abstract Since the open-pit precedence-constrained production scheduling problem is an NP-hard problem, solving it is always a challenging task, especially from a long-term perspective because a mineral deposit containing millions of blocks would require several million precedence arcs as constraints, making the…

  5. Direct block scheduling under marketing uncertainties

    Hudson Rodrigues Burgarelli, Felipe Ribeiro Souza, Alizeibek Saleimen Nader e mais 4REM - International Engineering Journal2018citado por 2 artigos

    Abstract Mineral projects are composed of geological, operational and market uncertainties, and reducing these uncertainties is one of the objectives of engineering. Most surveys assess the impact of geological and operational uncertainties on the mining planning. The objective of this work is to study the impact of…

  6. Grade uncertainty embedded in long term scheduling: stochastic mine planning

    Pablo Koury Cherchenevski, João Felipe Coimbra Leite Costa e Ricardo Hundelshaussen RubioREM - International Engineering Journal2019citado por 1 artigo

    Abstract The inclusion of grade uncertainty for multivariate mineral deposits is of great importance for the correct management of subsequent decisions involved in mining planning. Mapping grade uncertainties allows maximization of profit and resource extraction. In this article, the co-simulation turning band…

  7. An integrated pit-to-plant approach using technological models for strategic mine planning of copper and gold deposits

    Rodrigo Augusto Nunes, Giorgio de Tomi, Bladen Allan e mais 2REM - International Engineering Journal2019

    Abstract The strategic mine plan is a crucial step for the success of mining companies, and for its development, it is necessary to use a number of inter-related variables that are usually estimated independently. These variables include operational data that is traditionally isolated in information islands between…

  8. Stockyard management integrated into short-term mine planning using dynamic block modeling

    Rafael Josimar Araos Huaman, Irfan Ullah e Giorgio de TomiREM - International Engineering Journal2025

    Abstract Some open-pit mining operations rely heavily on stockyards as temporary storage areas. In addition to its conventional purpose, it is regarded as an excellent way for blending deposited material, which reduces fluctuation in the grade of material provided to the processing plant. However, traceability of the…

  9. Modeling and planning of bentonite clay mining: a case study at Bañado de Medina, Melo, Uruguay

    Renato da Silva Marques, Luis Eduardo de Souza, Luiz Delfino Albarnaz e mais 1Rem: Revista Escola de Minas2013citado por 1 artigo

    Mining planning and its correct sequencing are essential to facilitate the exploitation of minerals both economically and environmentally, thus ensuring the feasibility of the mining in operational and economic terms. The small geological complexity or the low aggregate value of a mineral deposit tends to result in…

  10. NPV analysis of multiple surface constraints for pit expansion scenarios under geological uncertainty

    Bruno Tomasi Kuckartz e Rodrigo Lemos PeroniREM - International Engineering Journal2019

    Abstract To optimize a mining project, it is necessary to deal with several technical aspects and constraints, such as orebody modelling, reserve estimation, blending strategy, optimal and operational pit designs, cost control, environmental issues, among others. In this sense, locating surface infrastructures is one…

  11. Direct block scheduling technology: Analysis of Avidity

    Felipe Ribeiro Souza, Hudson Rodrigues Burgarelli, Alizeibek Saleimen Nader e mais 6REM - International Engineering Journal2018citado por 1 artigo

    Abstract This study is focused on Direct Block Scheduling testing (Direct Multi-Period Scheduling methodology) which schedules mine production considering the correct discount factor of each mining block, resulting in the final pit. Each block is analyzed individually in order to define the best target period. This…

  12. Impact of grade distribution on the final pit limit definition

    Luiz Alberto Carvalho, Felipe Ribeiro Souza, Leonardo Soares Chaves e mais 4REM - International Engineering Journal2018citado por 1 artigo

    Abstract Geologic modeling is an important step in determining the benefits and final pit dimensions for mining operations. Geostatistical models and distance-based functions are the main methods used to estimate the grade behavior. However, these two methods, despite their similar mean values, differ in spatial…

  13. Incorporation of geological uncertainty in pit optimization with geostatistics simulation

    Rafael Alvarenga Souza e Ivo Eyer CabralREM - International Engineering Journal2017

    Abstract Risk mapping processes in mine planning and ore recovery are constantly used in the mining industry to increase decision making certainty based on the available information. However, it is not possible to predict the risk behavior in all of the project's boundary conditions and small variations in some of…

  14. Quantifying dilution caused by execution efficiency

    Taís Renata Câmara e Rodrigo de Lemos PeroniREM - International Engineering Journal2016

    Abstract In open pit mining, dilution is not always a factor systematically analyzed and calculated. Often it is only an adjusted number, for example, calculated or even empirically determined for a certain operational condition perpetuating along time in the form of a constant applied to calculating reserves or mine…

  15. Project optimization

    Carla De Carli e Peroni Rodrigo de LemosRem: Revista Escola de Minas2015

    A mineral deposit can be exploited by underground methods or by open pit methods, defined according to their characteristics, especially in relation to depth and geometry of the ore body and the economic feasibility of the methods. However, there are cases in which the alternative that represents the best return for…

  16. Analysis of the economic feasibility of a mining project due to the presence of natural underground cavities

    Iure Borges de Moura Aquino e Hernani Mota de LimaRem: Revista Escola de Minas2015

    The legislation for the protection and conservation of caves is recent in Brazil. In 2008, the Decree 6.640 was enacted and in 2009, the Normative Instruction Nº 2 by the Brazilian Environment Ministry (MMA, Portuguese acronyms) was published. Mining operations cause a significant impact on the caves when they are…

  17. Estimate of hourly productivity applied to elaboration and implementation of mining plans

    Edmo da Cunha Rodovalho e Ivo Eyer CabralRem: Revista Escola de Minas2014

    In order to elaborate a mine plan, it is necessary to adopt hourly production parameters for the equipment available for its execution. This equipment should be in synchrony with the productive capacity of the operational units in the mine for: rock drilling, blasting, loading and transporting ore. This study deals…

  18. Mine/Mill production planning based on a Geometallurgical Model

    Reinaldo Brandao Gomes, Giorgio De Tomi e Paulo S. AssisRem: Revista Escola de Minas2016citado por 1 artigo

    Abstract The Pau Branco mine supplies two blast furnaces with iron ore lumps, and currently, charcoal consumption for pig iron production accounts for 47% of the blast furnaces' operational cost. A geometallurgical model is presented to support an economic study considering reserve volumes, product quality, and…