Project optimization

Carla De Carli e Peroni Rodrigo de Lemos

em inglês

cita 10 obras

resumo

A mineral deposit can be exploited by underground methods or by open pit methods, defined according to their characteristics, especially in relation to depth and geometry of the ore body and the economic feasibility of the methods. However, there are cases in which the alternative that represents the best return for the project is the application of combined methods, i.e., the open pit followed by underground mining. In these situations, the major difficulty is the definition of the transition point of methods, seeking to maximize the net present value of the project and the use of mineral resources. The premature suspension of activities in the open pit, as well as advancing beyond the optimum depth, can derail the implementation of the combination of methods, so it is important to analyze the project not only individually but also in an integrated way.

como citar · ABNT NBR 6023

CARLI, Carla De; LEMOS, Peroni Rodrigo de. Project optimization. Rem: Revista Escola de Minas, 2015. DOI: 10.1590/0370-44672015680018.

Referências

10 obras citadas

  1. 1E. BAKHTAVAR e K. SHAHRIAR. Optimal ultimate pit depth considering an underground alternative. 2007quem mais cita →
  2. 2E. BAKHTAVAR, K. SHAHRIAR e K. ORAEE. An approach towards ascertaining open-pit to underground transition depth. Journal of Applied Sciences, 2008quem mais cita →
  3. 3E. BAKHTAVAR, K. SHAHRIAR e K. ORAEE. A Model for determining optimal transition depth over from open pit to underground mining. 2008quem mais cita →
  4. 4E. BAKHTAVAR, K. SHAHRIAR e K. ORAEE. An approach towards ascertaining open pit to underground transition depth. Journal of Applied Sciences, 2008quem mais cita →
  5. 5J. P. CAMUS. Open pit optimization considering an underground alternative. 1992quem mais cita →
  6. 6J. CHADWICK. Open pit or underground (going underground, or not). International Mining Magazine, 2008quem mais cita →
  7. 7C. De CARLI. Análise de projetos limite: lavra a céu aberto x lavra subterrânea. 2013quem mais cita →
  8. 8R. HALATCHEV. Company strategy – a basis for production scheduling of an open pit complex. 1999quem mais cita →
  9. 9J. M. RENDU. An Introduction to Cut-off Grade Estimation. 2008quem mais cita →
  10. 10W. F. VISSER e B. DING. Optimization of the transition from open pit to underground mining. 2007quem mais cita →

Quem cita esta obra

nenhum artigo do acervo cita esta obra — ainda

É sua obra?

Receba um aviso quando um artigo novo citar este trabalho.

também serve para acompanhar o autor que você estuda
Acompanhar as citações