REM - International Engineering Journal2019
An integrated pit-to-plant approach using technological models for strategic mine planning of copper and gold deposits
Rodrigo Augusto Nunes, Giorgio de Tomi, Bladen Allan, Erbertt Barros Bezerra e Ranyere Sousa Silva
em inglês
resumo
Abstract The strategic mine plan is a crucial step for the success of mining companies, and for its development, it is necessary to use a number of inter-related variables that are usually estimated independently. These variables include operational data that is traditionally isolated in information islands between the different departments in the mine or they are consolidated into individual models. This reduces the holistic view of the deposit, thereby causing a negative impact on the results of the strategic planning itself. In order to improve the process and to maximize the production and/or value of a mining project, there needs to be an integration of the geology, the mine plan, the processing and the geometallurgy data. In order to accomplish this, a new methodology is proposed for the creation of a technological model. This model can be interpreted as the consolidation of the different models required for a better understanding of the geological and technical information of the deposit. This concept was developed and applied at a copper and gold mine site located in Brazil. Based on the evaluation of different blasting and mill productivity scenarios through a pit-to-plant approach, it was possible to obtain operational short-term gains such as a 10.7% increase in the plant production rate and a 2.2% increase in the crusher's feed rate with little or no capital investment.
como citar · ABNT NBR 6023
NUNES, Rodrigo Augusto et al. An integrated pit-to-plant approach using technological models for strategic mine planning of copper and gold deposits. REM - International Engineering Journal, 2019. DOI: 10.1590/0370-44672018720060.
Referências
16 obras citadas · 1 no acervo
- 1M. AUGUSTIN, M. BONKEKA e M. PATRICK. Strategic mine planning approach applied to large scale copper open pit mines by comparing the impact of three different bloc models of the same deposit, on the Long Term Mine Plan. International Journal of Advanced Research in Engineering, 2017quem mais cita →
- 2M. GODOY. A Risk analysis based framework for strategic mine planning and design - method and application. Advances in Applied Strategic Mine Planning, 2018quem mais cita →
- 3R. B. GOMES, G. DE TOMI e P. A. ASSIS. Mine/Mill production planning based on a Geometallurgical Model. REM: Revista Escola de Minas, 2016no acervo →
- 4A. JANKOVIC e W. VALERY. New methodology to improve productivity of mining operations. 2011quem mais cita →
- 5JKTech. JKSimMet - Version 6.0 Steady State Mineral Processing Simulator. 2014quem mais cita →
- 6S. S. KANCHIBOTLA, T. G. VIZCARRA, S. A. R. MUSUNURI e mais 3. Mine to mill optmisation at paddington gold operations. 2015quem mais cita →
- 7S. NADOLSKI, B. KLEIN, D. ELMO e mais 1. Cave-to-mill: a mine-to-mill approach for block caves mines. Mining Technology, 2015quem mais cita →
- 8A. NAVARRA, T. GRAMMATIKOPOULOS e K. WATERS. Incorporation of geometallurgical modelling into long-term production planning. Minerals Engineergin, 2018quem mais cita →
- 9D. LA ROSA, L. RAJAVUORI, J. KORTENIEMI e mais 1. Geometallurgical modelling and ore tracking at Kittila Mine. 2014quem mais cita →
- 10C. LUND e P. LAMBERG. Geometallurgy - a tool for better resource efficiency. European geologist, 2014quem mais cita →
- 11K. NAGESWARARAO. A Generalised model for hydrocyclone classifiers. Proceedings of Australasian Institute of Mining and Metallurgy, 1995quem mais cita →
- 12C. PHILANDER e A. ROZENDAAL. A process mineralogy approach to geometallurgical model refinement for the Namakwa Sands heavy minerals operations, west coast of South Africa. Minerals Engineering, 2014quem mais cita →
- 13N. SILVA. Metodologia de planejamento estratégico de lavra incorporando riscos e incertezas para a obtenção de resultados operacionais. 2008quem mais cita →
- 14A. SINCLAIR e G. BLACKWELL. Applied mineral inventory estimation. 2002quem mais cita →
- 15SPLIT ENGINEERING. Split-Desktop - Version 4.0. 2017quem mais cita →
- 16W. J. WHITEN e M. E. WHITE. Modeling and simulation of high tonnage crushing plants. 1979quem mais cita →
Quem cita esta obra
nenhum artigo do acervo cita esta obra — ainda
É sua obra?
Receba um aviso quando um artigo novo citar este trabalho.
também serve para acompanhar o autor que você estuda