acervo aberto · SciELO Brasil, Portugal e Espanha

709 mil artigos científicos, abertos e ligados entre si.

Cada obra mostra o resumo, a referência ABNT pronta, o que ela cita e quem no acervo a cita — para seguir a conversa de um artigo ao outro.

Obras para “Scheduling”

idioma
qualquerportuguêsinglêsespanhol
país
qualquerBrasilPortugalEspanha
tipo
tudoartigorevisãorelato de casocomunicação breve
anos
ordem
automáticarelevânciamais recentes
  1. A heuristic approach to optimize the production scheduling of fruit-based beverages

    Alyne Toscano, Deisemara Ferreira, Reinaldo Morabito e mais 1Gestão & Produção2020

    Abstract: In this paper, the fruit-based beverage production scheduling problem is studied. The aim is to determine the lot sizing and scheduling production, optimizing inventory costs, backorders and cleanings. Fruit-based beverage production processes typically consist of two production stages, beverage preparation…

  2. Comparison between the application of the conventional mine planning and of the direct block scheduling on an open pit mine Project

    Pedro Henrique Alves Campos, Ivo Eyer Cabral, Carlos Enrique Arroyo Ortiz e mais 1REM - International Engineering Journal2018citado por 2 artigos

    Abstract Historically, since the 60's, traditional mine planning consists of several distinct stages: 1) Definition of the ultimate pit - the portion of the blocks that results in the greatest total value; 2) Pushback selection - based on the generation of nested pits, obtained with the change in the value of the ore…

  3. Direct block scheduling under marketing uncertainties

    Hudson Rodrigues Burgarelli, Felipe Ribeiro Souza, Alizeibek Saleimen Nader e mais 4REM - International Engineering Journal2018citado por 2 artigos

    Abstract Mineral projects are composed of geological, operational and market uncertainties, and reducing these uncertainties is one of the objectives of engineering. Most surveys assess the impact of geological and operational uncertainties on the mining planning. The objective of this work is to study the impact of…

  4. CROSS-DOCK SCHEDULING WITH ROUTING DECISIONS: AN INTEGRATED APPROACH

    Eduardo Delcides Bernardes e Franklina Maria Bragion ToledoPesquisa Operacional2026

    ABSTRACT Defining delivery routes is an effective way to reduce transportation costs. In particular, a cross-dock distribution center in a retail network requires coordinated decisions on delivery routes and internal operations, leading to the cross-dock scheduling with routing decisions problem. To the best of our…

  5. SCHEDULING OF JOBS WITH DETERIORATING PROCESSING TIMES DEPENDING ON DUE DATES

    Abida Kerdali e Mourad BoudharPesquisa Operacional2025

    ABSTRACT This paper focuses on a scheduling problem that arises when job processing times are variable and subject to change based on due dates. The objective is to minimize the makespan on a single machine, while ensuring that jobs are completed independently and without interruption. This problem is challenging due…

  6. Multi-Objective Task Scheduling for Earth Observation InSAR Satellites via Non-Dominated Sorting Student Psychology Based Optimization Algorithm

    Qingxian Jia, Weicheng Lian, Dan Yu e mais 1Journal of Aerospace Technology and Management2025

    ABSTRACT This paper investigates the task scheduling problem for the Earth observation Interferometric Synthetic Aperture Radar (InSAR) satellite system. The mission time window generation method is introduced, and the constraint satisfaction model for task scheduling in the InSAR satellite system is constructed. To…

  7. Epigenomics Scientific Big Data Workflow Scheduling for Cancer Diagnosis in Health Care Using Heterogeneous Computing Environment

    Wakar Ahmad, Bashir Alam, Swati Sharma e mais 1Brazilian Archives of Biology and Technology2023

    Abstract DNA methylation and Histone are the main constituents to oversee the stable maintenance of cellular phenotypes. Any abnormalities in these components could cause cancer development and, therefore, must be potentially diagnostic. The Epigenomics research field is the study of epigenetic modification which…

  8. Scheduling for Additive Manufacturing: a literature review

    Gabriela Dall’Agnol, Juliana Keiko Sagawa e Roberto Fernandes Tavares NetoGestão & Produção2022

    Abstract: Advancements in production technologies and materials have facilitated the use of additive manufacturing (AM) (i.e., 3D printing) in the large-scale production of finished products with high level of customization, simplification of the factory floor, and fast delivery. Production sequencing is a…

  9. Testing the Performance of Bat-Algorithm for Permutation Flow Shop Scheduling Problems with Makespan Minimization

    Jeen Robert Bellabai, Brabin Nivas Murugadhas Leela e Senthil Maharaj Ramesh KennedyBrazilian Archives of Biology and Technology2022citado por 1 artigo

    Abstract In this work, a BAT Algorithm is proposed to solve the permutation flow shop scheduling problem (PFSSP) with minimizing makespan criterion. In a PFSSP, there are n-jobs and m-machines with a proportional deterioration is considered in which all machines process the jobs in the same order, i.e., a permutation…

  10. MODELING AND MIP-HEURISTICS FOR THE GENERAL LOTSIZING AND SCHEDULING PROBLEM WITH PROCESS CONFIGURATION SELECTION

    Beatriz Empke Villas Boas, Victor C. B. Camargo e Reinaldo MorabitoPesquisa Operacional2021

    ABSTRACT In some industrial contexts, such as in the molded pulp, paper, furniture and electro fused grain industries, items or final products are obtained by processes that can produce several types of products simultaneously. These processes are considered here as any specific mode of operation or configuration of a…

  11. INTEGRATED LOTSIZING, SCHEDULING AND BLENDING DECISIONS IN THE SPINNING INDUSTRY

    Victor C. B. Camargo, Bernardo Almada-Lobo e Franklina M. B. ToledoPesquisa Operacional2021

    ABSTRACT In this paper, the relevance of integrated planning concerning decisions of production and blending in a spinning industry is studied. The scenario regards a plant that produces several yarn packages over a planning horizon. Each yarn type is produced using a blend of several cotton bales that must contain…

  12. DECOMPOSITION BASED HEURISTICS FOR A LOT SIZING AND SCHEDULING PROBLEM ON MULTIPLE HETEROGENEOUS PRODUCTION LINES WITH PERISHABLE PRODUCTS

    Willy A. de Oliveira Soler, Maristela O. Santos e Kerem AkartunalıPesquisa Operacional2021

    ABSTRACT In this paper, we propose a novel MIP-based heuristic method to deal with a lot sizing and scheduling problem with multiple heterogeneous production lines in a production setting with perishable items. The problem is inspired by the production processes adopted by some Brazilian food industries and it…

  13. Information workflow proposal for integrating cost estimating, scheduling, and monitoring with BIM in SMEs

    Mirian Caroline Farias Santos, Dayana Bastos Costa e Emerson de Andrade Marques FerreiraAmbiente Construído2021

    Abstract Although many studies have emphasized the benefits of the integration of Building Information Modeling (BIM), there is no consensus on the information workflow among main processes used in construction, particularly in small- and medium-size enterprises (SMEs). Therefore, this work proposes an information…

  14. A DYNAMIC JOB SHOP MODEL FOR SCHEDULING TASKS IN A SOFTWARE DEVELOPMENT ENVIRONMENT

    Sildenir A. Ribeiro, Eber A. Schmitz, Mônica F. da Silva e mais 1JISTEM - Journal of Information Systems and Technology Management2021

    ABSTRACT This work proposes a Dynamic Job Shop Scheduling (DJSS) model for scheduling the task in a software production environment. The aim is to organize the insertion of tasks in the shop in a precedence order previously defined that obeys the mapping of the critical path and the critical chain to identify…

  15. Scheduling optimum planting window for gladiola based on El Niño Southern Oscillation

    Camila Coelho Becker, Nereu Augusto Streck, Lilian Osmari Uhlmann e mais 1Scientia Agricola2020citado por 5 artigos

    ABSTRACT: Gladiola is an important cut flower worldwide and scheduling field gladiola production is largely dependent on planting at the correct time since its development is controlled by the air temperature. The aim of this study was to configure a planting window of gladiola in order to harvest spikes to be sold on…

  16. EXPLOITING THE TIMETABLING FLEXIBILITY IN THE CONTEXT OF THE VEHICLE SCHEDULING PROBLEM WITH HETEROGENEOUS FLEET

    Monize Sâmara Visentini, Olinto César Bassi de Araújo, Denis Borenstein e mais 1Pesquisa Operacional2019

    ABSTRACT In the context of a heterogeneous fleet, the single-depot Vehicle Scheduling Problem is known as the Vehicle Type Scheduling Problem (VTSP). In this paper, we extend a VTSP model proposed in the literature to enable timetabling flexibility. Two strategies were developed to promote flexibility: aggregated…