acervo aberto · SciELO Brasil, Portugal e Espanha

709 mil artigos científicos, abertos e ligados entre si.

Cada obra mostra o resumo, a referência ABNT pronta, o que ela cita e quem no acervo a cita — para seguir a conversa de um artigo ao outro.

Obras para “Jorge Luiz Valença Mariz”

idioma
qualquerportuguêsinglêsespanhol
país
qualquerBrasilPortugalEspanha
tipo
tudoartigorevisãorelato de casocomunicação breve
anos
ordem
automáticarelevânciamais recentes
  1. Assessing the impact of road geometry and rolling resistance on transportation costs and productivity in an iron ore mine in Brazil

    Gleicon Roberto de Sousa Maior, Rodrigo de Lemos Peroni e Jorge Luiz Valença MarizREM - International Engineering Journal2025

    Abstract The longitudinal grade and rolling resistance of mining haul roads are critical factors that significantly influence transportation costs and productivity in open-pit mining. Inadequate geometric design and high rolling resistance can lead to increased energy consumption, higher rates of mechanical failure…

  2. A Constraint Programming approach to solve the clustering problem in open-pit mine planning

    Jorge Luiz Valença Mariz, Rodrigo de Lemos Peroni e Ricardo Martins de Abreu SilvaREM - International Engineering Journal2024

    Abstract Since the open-pit precedence-constrained production scheduling problem is an NP-hard problem, solving it is always a challenging task, especially from a long-term perspective because a mineral deposit containing millions of blocks would require several million precedence arcs as constraints, making the…

  3. Stochastic economic feasibility assessment and risk analysis of a quarry mine focusing on the Brazilian tax system

    Jorge Luiz Valença Mariz, Suelen Silva Rocha, Júlio César de Souza e mais 1REM - International Engineering Journal2023

    Abstract An economic feasibility study must consider the uncertainties inherent to a mining project, whose risks must be quantified properly to enable accurate decision-making. Studies previously carried out through the Discounted Cash Flow (DCF) methodology in the project evaluated here - a quarry whose operations…