A high-level dynamic analysis approach for studying global process plant availability and production time in the early stages of mining projects

Dennis Travagini Cremonese, Bhaskar Karanth e Giorgio de Tomi

em inglês

citado por 1 artigocita 16 obras

resumo

Abstract In the early stage of front-end studies of a Mining Project, the global availability (i.e. number of hours a plant is available for production) and production (number of hours a plant is actually operated with material) time of the process plant are normally assumed based on the experience of the study team. Understanding and defining the availability hours at the early stages of the project are important for the future stages of the project, as drastic changes in work hours will impact the economics of the project at that stage. An innovative high-level dynamic modeling approach has been developed to assist in the rapid evaluation of assumptions made by the study team. This model incorporates systems or equipment that are commonly used in mining projects from mine to product stockyard discharge after the processing plant. It includes subsystems that will simulate all the component handling, and major process plant systems required for a mining project. The output data provided by this high-level dynamic simulation approach will enhance the confidence level of engineering carried out during the early stage of the project. This study discusses the capabilities of the approach, and a test case compared with standard techniques used in mining project front-end studies.

como citar · ABNT NBR 6023

CREMONESE, Dennis Travagini; KARANTH, Bhaskar; TOMI, Giorgio de. A high-level dynamic analysis approach for studying global process plant availability and production time in the early stages of mining projects. REM - International Engineering Journal, 2017. DOI: 10.1590/0370-44672016700043.

Referências

16 obras citadas

  1. 1T. ALTIOK. Large-scale simulation modeling of ports and waterways: approaches and Challenges. Anais..., 2010quem mais cita →
  2. 2G. ASBJÖRNSSON, E. HULTHÉN e M. EVERTSSON. Modelling and dynamic simulation of gradual performance deterioration of a crushing circuit - Including time dependence and wear. Minerals Engineering, 2012quem mais cita →
  3. 3G. ASBJÖRNSSON, E. HULTHÉN e M. EVERTSSON. Modelling and simulation of dynamic crushing plant behavior with MATLAB/Simulink. Minerals Engineering, 2013quem mais cita →
  4. 4B. BERGQUIST. Traceability in iron ore processing and transports. Minerals Engineering, 2012quem mais cita →
  5. 5A. BERTON. Ore storage simulation for planning a concentrator expansion. Minerals Engineering, 2013quem mais cita →
  6. 6C.R.O. CARDOSO e M.B. TELES. Simulação de terminal portuário. Anais..., 1997quem mais cita →
  7. 7D.T. CREMONESE. Desenvolvimento e aplicação de metodologia para estudos de simulação dinâmica na cadeia do minério de ferro. 2014quem mais cita →
  8. 8D.T. CREMONESE e P. LIVORATTI. Simulation tools: a study of application at the Nouadhibou Port. Anais..., 2012quem mais cita →
  9. 9ERNST & YOUNG. Canadian mining companies focused on cost control, project execution in 2013. Ernst & Young. 2013quem mais cita →
  10. 10R. B. GOMES, G. DE TOMI e P. S. ASSIS. Impact of quality of iron ore lumps on sustainainability of mining operations in the Quadrilatero Ferrifero Area. Minerals Engineering, 2015quem mais cita →
  11. 11A. F. JULIÁ. Desenvolvimento de um modelo de simulação para dimensionamento de um sistema integrado pátio-porto na cadeia do minério de ferro. 2010quem mais cita →
  12. 12J. D. LE ROUX. Analysis and validation of a run-of-mine ore grinding mill circuit model for process control. Minerals Engineering, 2013quem mais cita →
  13. 13M. J. MILLER. Stockpiling and reclaiming systems in mill design. SME. SME-AIME. Fall Meeting and Exhibit, 1979quem mais cita →
  14. 14K. NIKKHAH e C. ANDERSON. Role of simulation software in design and operation of metallurgical plants: a case study. 2001quem mais cita →
  15. 15W. STANGE e B. COOPER. Value options and flexibility in plant design, metplant - metallurgical plant design and operating strategies. 2008quem mais cita →
  16. 16A. VASEBI, E. POULIN e D. HODOUIN. Selecting proper uncertainty model for steady-state data reconciliation - Application to mineral and metal processing industries. Minerals Engineering, 2014quem mais cita →

Quem cita esta obra

1 artigo do acervo

quem fala desta obra

3 pessoas

É sua obra?

Receba um aviso quando um artigo novo citar este trabalho.

também serve para acompanhar o autor que você estuda
Acompanhar as citações