Optimizing short-term production plan using a portfolio optimization model

Morteza Osanloo e Mehdi Rahmanpour

em inglês

cita 24 obras, 1 no acervo

resumo

Abstract Short-term production plans are the basis for operational mine production schedules. They concentrate on making long-term mine plans operationally feasible. It ensures a steady flow of product for meeting blending targets. Due to the quality variation of material, blend optimization is an uncertainty based optimization problem. There are different approaches toward uncertainty management and the current paper investigates a portfolio optimization model in order to minimize the risks in short-term plans. In this paper, a fuzzy linear programming model is formulated to provide a set of options for the mine plan. These blending options are treated as portfolios. Then a model for the optimal selection of a portfolio is introduced. The objective of the model is to maximize the expected return of the portfolio under constraints limiting its variance. The model is applied in a limestone mine complex.

como citar · ABNT NBR 6023

OSANLOO, Morteza; RAHMANPOUR, Mehdi. Optimizing short-term production plan using a portfolio optimization model. REM - International Engineering Journal, 2017. DOI: 10.1590/0370-44672016700071.

Referências

24 obras citadas · 1 no acervo

  1. 1M. W. A. ASAD. A heuristic approach to long-range production planning of cement quarry operations. Production Planning & Control, 2011quem mais cita →
  2. 2Y. AZIMI, M. OSANLOO e A. ESFAHANIPOUR. An uncertainty based multi-criteria ranking system for open pit mining cut-off grade strategy selection. Resources Policy, 2013quem mais cita →
  3. 3M.M. BADIOZAMANI e H. ASKARI-NASAB. Integration of reclamation and tailings management in oil sands surface mine planning. Environmental Modelling & Software, 2014quem mais cita →
  4. 4S. BENNINGA. Financial modeling. 2008
  5. 5L. CACCETTA e S. P. HILL. An application of branch and cut to open pit mine scheduling. J. Global Optimization, 2003quem mais cita →
  6. 6C. CARLSSON e P. KORHONEN. A parametric approach to fuzzy linear programming. Fuzzy Sets and Systems, 1986quem mais cita →
  7. 7K. DAGDELEN. Open pit optimization - strategies for improving economics of mining projects through mine planning. Orebody modelling and stochastic mine planning, 2007quem mais cita →
  8. 8H. EIVAZY e H. ASKARI-NASAB. A mixed integer linear programming model for short-term open pit mine production scheduling. Mining Technology, 2012quem mais cita →
  9. 9A. FERNANDEZ e S. GOMEZ. Portfolio selection using neural networks. Comput. Oper. Res, 2007quem mais cita →
  10. 10M. M. FIORONI, T. J. BIANCHI e R. P. LUIZ. Concurrent simulation and optimization models for mining planning. Proceedings..., 2008quem mais cita →
  11. 11M. GODOY e R. DIMITRAKOPOULOS. Managing risk and waste mining in long-term production scheduling of open-pit mines. SME Transactions, 2004quem mais cita →
  12. 12C. HO. Evaluating the impact of operating environments on MRP system nervousness. International Journal of Production Research, 1989quem mais cita →
  13. 13G. JUAREZ, R. DODDS, A. ECHEVERRIA e mais 4. Open pit strategic mine planning with automatic phase generation. Proceedings..., 2014quem mais cita →
  14. 14B. KING. Modelling open pit and underground production scheduling in concert. Proceedings..., 2014quem mais cita →
  15. 15M. KUMRAL e P. A. DOWD. Short term mine production scheduling for industrial mineral using multi objective simulated annealingquem mais cita →
  16. 16H. MARKOWITZ. Portfolio selection. J. Financ, 1952
  17. 17R. S. MARQUES, L. E. SOUZA, L. D. ALBARNAZ e mais 1. Modeling and planning of bentonite clay mining: a case study at Bañado de Medina, Melo, Uruguay. REM: R. Esc. Minas, Ouro Preto, 2013no acervo →
  18. 18C. MORLEY, V. SNOWDEN e D. DAY. Financial impact of resource / reserve uncertainty. The J. of the Southern African Institute of Mining and Metallurgy, 1999quem mais cita →
  19. 19J. MULA, R. POLER, J.P. GARCIA-SABATER e mais 1. Models for production planning under uncertainty: a review. Int. J. Production Economics, 2006quem mais cita →
  20. 20A. M. NEWMAN, E. RUBIO, R. CARO e mais 2. A review of operations research in mine planning. Interfaces, 2010quem mais cita →
1–20 de 24 obras citadas

Quem cita esta obra

nenhum artigo do acervo cita esta obra — ainda

É sua obra?

Receba um aviso quando um artigo novo citar este trabalho.

também serve para acompanhar o autor que você estuda
Acompanhar as citações