Pesquisa Operacional2009

Testing and preventive maintenance scheduling optimization for aging systems modeled by generalized renewal process

Vinícius Correa Damaso e Pauli Adriano de Almada Garcia

em inglês

citado por 3 artigoscita 16 obras

resumo

The use of stochastic point processes to model the reliability of repairable systems has been a regular approach to establish survival measures in failure versus repair scenarios. However, the traditional processes do not consider the actual state in which an item returns to operational condition. The traditional renewal process considers an "as-good-as-new" philosophy, while a non-homogeneous Poisson process is based on the minimal repair concept. In this work, an approach based on the concept of Generalized Renewal Process (GRP) is presented, which is a generalization of the renewal process and the non-homogeneous Poisson process. A stochastic modeling is presented for systems availability analysis, including testing and/or preventive maintenances scheduling. To validate the proposed approach, it was performed a case study of a hypothetical auxiliary feed-water system of a nuclear power plant, using genetic algorithm as optimization tool.

como citar · ABNT NBR 6023

DAMASO, Vinícius Correa; GARCIA, Pauli Adriano de Almada. Testing and preventive maintenance scheduling optimization for aging systems modeled by generalized renewal process. Pesquisa Operacional, 2009. DOI: 10.1590/S0101-74382009000300006.

Referências

16 obras citadas

  1. 1V.C. Damaso, C.M.N.A. Pereira e P.F.F. Frutuoso e Melo. Application of Integrated Optimization to the Control Room Air-Conditioning System of the Angra I Nuclear Power Plant. 2007quem mais cita →
  2. 2V.C. Damaso. An integrated optimization modeling for safety system availability using genetic algorithms. 2006quem mais cita →
  3. 3P.A.A. Garcia, V.C. Damaso, M.C. Sant'Ana e mais 1. Genetic algorithm optimization of preventive maintenance scheduling for repairable systems modeled by GRP. 2008quem mais cita →
  4. 4P.A.A. Garcia, C.M.C. Jacinto e E.A.L. Droguett. A multiobjective genetic algorithm for blowout preventer test scheduling optimization. Proceeding of Applied Simulation and Modelling, 2005quem mais cita →
  5. 5D.E. Goldberg. Genetic algorithms in search, optimization, and machine learning. 1989quem mais cita →
  6. 6A.G. Jacopino. Generalization and bayesian solution of the general renewal process for modeling the reliability effect of imperfect inspection and maintenance based imprecise data. 2005quem mais cita →
  7. 7M. Kijima e N. Sumita. A useful generalization of renewal theory: counting process governed by non-negative Markovian increments. Journal of Applied Probability, 1986quem mais cita →
  8. 8C.M.F. Lapa, C.M.N.A. Pereira e A.C.A. Mol. Maximization of a nuclear system availability through maintenance scheduling optimization using a genetic algorithm. Nuclear Engineering and Design, 2000quem mais cita →
  9. 9E.E. Lewis. Introduction to reliability engineering. 1987quem mais cita →
  10. 10S. Martorell, S. Carlos, J.F. Villanueva e mais 4. Test interval optimization of safety systems of nuclear Power plant using fuzzy-genetic approach. Reliability Engineering and System Safety, 2007quem mais cita →
  11. 11S. Martorell, S. Carlos, J.F. Villanueva e mais 4. Use of multiple-objective evolutionary algorithms in optimizing surveillance requirements. Reliability Engineering and System Safety, 2006quem mais cita →
  12. 12S. Martorell, S. Carlos, A. Sánchez e mais 1. Constrained optimization of test interval using a steady-state genetic algorithm. Reliability Engineering and System Safety, 2000quem mais cita →
  13. 13M.C. Moura, S.P.V. Rocha, E.A.L. Droguett e mais 1. Avaliação bayesiana da eficácia da manutenção via processo de renovação generalizado. Pesquisa Operacional, 2008quem mais cita →
  14. 14D.K. Rao, V. Gopika, H.S. Kushwaha e mais 2. Test interval optimization of safety system of nuclear power plant using fuzzy-genetic approach. Reliability Engineering and System Safety, 2007quem mais cita →
  15. 15A. Sanchez, S. Carlos, S. Martorell e mais 1. Addressing imperfect maintenance modelling uncertainty in unavailability and cost based optimization. Reliability Engineering and System Safety, 2009quem mais cita →
  16. 16M. Yañes, F. Jolgar e M. Modarres. Generalized renewal process for analysis of repairable systems with limited failure experience. Reliability Engineering and System Safety, 2002quem mais cita →

Quem cita esta obra

3 artigos do acervo

ano a anomais citada em 2012 · 2 artigos
Mais citada em 2012, com 2 artigos.
  • 2012: citada em 2 artigos
  • 2014: citada em 1 artigo

quem fala desta obra

11 pessoas
ver as 11 pessoas e os artigos →

É sua obra?

Receba um aviso quando um artigo novo citar este trabalho.

também serve para acompanhar o autor que você estuda
Acompanhar as citações